Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

December 30, 2023

April 28, 2024

Multiple Locations

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Fort Valley, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Fort Valley Utility Commission will accept sealed bids for the construction and installation to replace the natural gas system on Hardeman Ave. and Valley View Dr in Fort Valley. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) calendar days after bid opening date. All potential bidders must hold a current Georgia Utility Contractors License of proper classification and in full force and effect, in compliance with Act. O.C.G.A. 43-14. Contractor must be a qualified natural gas contractor under the laws of the State of Georgia and must comply with any Federal, State, and Municipal guidelines and regulations. Plans, specifications, and contract documents are available for review at the Fort Valley Utility Commission, Gas Department, during regular business hours. The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows Natural Gas System Replacement - Hardeman Ave. & Valley View Dr, Fort valley The successful Contractor will be required to start construction by December 30, 2023 The Work will be substantially completed within 120 days after the date when the Contract Times commence to run as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions within 120 days after the date when the Contract Times commence to run. A 5% Bid Bond is required, either by Surety Bond or check. The Fort Valley Utility Commission reserves the right to accept none, all or any part of the bid and to waive informalities or technicalities or to re-advertise as appropriate.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects