Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

March 8, 2024

March 17, 2025

To Be Determined

Renovation

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Joint Base Pearl Hbr Hickam, HI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This Design-Build project is to replace the roof and roof structure; install a fire protection system; replace electrical panel at 3rd floor; provide new supports, junction boxes, feeders, and switches for conduits and AHU; provide new lighting at Building 2060's Extension (Utility Building). The project duration is 374 days, including design time. The project is prevailing wage. Trades required: Construction Office Trailer, Portable Restrooms, Temporary Fencing, Temporary Cooling, Temporary Dust Control, Material Testing & Inspections, Demolition, HAZMAT Material Testing, Asbetsos Abatement, Concrete, Unit Masonry, Brick Veneer Masonry, Rough Carpentry, Structural Wood Framing, Wood Joists, Modified Bitumen Roofing, Flashing & Sheet Metal, Gutters & Downspouts, Insulation, Joint Sealants, Gypsum Board, Metal Stud Framing, Acoustical Ceilings, Painting, Fire Extinguishers, Fire Sprinklers, Plumbing, HVAC, HVAC Performance Testing, Electrical, & Fire Alarm.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.