Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

December 8, 2023

January 19, 2024

70 North Ave

Renovation

No Information to Display

$50,000.00

Public - City

img_map_placeholder

70 North Ave, Westport, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Westport Board of Education ("Owner" or "WBOE") reserves the right to reject any and all bids, or any parts thereof, may waive informalities or minor defects in the Bids, or accept any proposal it deems to be in the best interest of the Board of Education and/or the Town of Westport ("Town"). The Westport Board of Education is exempt from the payment of Federal Excise Taxes and Connecticut Sales and Use Tax according to State Statute. Such taxes must not be included in bid prices nor added to any items specified. Installations must be completed before January 19, 2024 with work being done during second shift. No substitutions will be accepted. Questions may be emailed to ncarrignan@westportps.org beginning Wednesday, October 11, 2023 but must be date stamped not later than noon, Friday, November 3, 2023. The Board of Education reserves the right to reject any bid if it is deemed to be in the best interests of the Town of Westport, Connecticut, Westport Board of Education and its students. The Board of Education reserves the right to grant an award in total or for any part thereof for the items or services being bid. In addition, the Board of Education reserves the right to award this bid as a package in conjunction with other bids for similar services/supplies/equipment. The Board reserves the right to award with preference to State of Connecticut contract holders and/or local vendors. 3. The submission of a bid shall be conclusive evidence that the bidder has satisfied himself as to the requirements of the bid specifications and any controlling conditions which may exist. 4. Bidders may not withdraw their bid for a period of 120 days from the date of bid opening. The Board of Education and the bidder may mutually agree to extend the time limit.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.