Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 24, 2023

March 3, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Mansfield, MO

Subscribe to View Full Documents

This project will stormwater related improvements at ten (10) locations within city limits. Improvements consist of new storm drain pipe, inlets, curb and gutter, culverts, grading, concrete paving, asphalt repair, and other infrastructure improvements. Questions regarding this information may be directed to: Great River Engineering Kelly Short 2826 S. Ingram Mill Road Springfield, Missouri 65804 (417) 886-7171 (phone) (417) 886-7591 (fax). It shall be mandatory upon each contractor to pay the current prevailing hourly rate of wages as set forth in the Wage Determination Orders of the Department of Labor and Industrial Relations of Missouri for Wright County, Missouri. Please reference the Contract Documents. The District hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry or national origin in consideration for an award. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and/or State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE, WBE and Section 3-DBE bidders are encouraged to bid. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Interested bidders may also pick up the electronic bidding documents at the address above. The contractor is responsible for printing the documents. Contractor must be a registered bidder on the Engineer's Plan Holder List to be eligible to bid on the project.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects