Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 30, 2023

November 30, 2023

June 5, 2024

1301 Eastlawn Dr

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

1301 Eastlawn Dr, Midland, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

1. The purchase and delivery of a KOLPAK(R) 10'X12'X7'6" walk in freezer or equivalent manufacture. 2. Setup and installation of freezer to include condensers. 3. All electrical, mechanical, and plumbing associated with installation. Scope of Work: 1. This is a Request for Proposal for the purchase and installation of one walk-in freezer with floor at Midland High School 1301 Eastlawn Dr, Midland, Mi 48642. 2. The contractor is responsible for the purchase of any installation materials above and beyond what is provided by the manufacturer to safely install specified equipment. 3. The contractor is responsible for the removal of all scrap from the installation of the freezer. 4. The contractor is responsible for the removal and capping off existing light fixture as needed. 5. This is a turnkey installation; freezer must be fully functioning at the end of installation and signed off by the district before final payment is made. 6. All mechanical, electrical, and plumbing hook-ups are to meet all State codes and to manufactures specifications. 7. Contractors must field verify all measurements and meet with the districts representative to clarify all work to be performed. The Board of Education reserves the right to accept or reject any or all item(s) in the bid; to accept or reject any or all bid(s); to waive any informalities therein; or for any reason, to award the contract to other than the low bidder. If a unit price or extended price is obviously in error and the other is obviously correct, the incorrect price will be disregarded. All bids shall be firm for ninety days (90) from the date of the bid opening. All bids must include a signed "Iran Economic Sanctions Act Certification" a "Familial Relationship Disclosure" form and "Compliance with School Safety Initiative Legislation" (enclosed with RFP documents). The work shall start within one month of receiving a district purchase order and be completed within six weeks from the start of work. The start date may be extended due to a delay in taking delivery of required equipment, but all work must be completed by June 5, 2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.