Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 8, 2024

January 7, 2025

W Main St

Site Work

No Information to Display

$2,380,000.00

Public - City

img_map_placeholder

W Main St, Shiloh, OH

Subscribe to View Full Documents

The bid specifications, drawings, plan holders list, addenda, and other bid information (but not the bid forms) may be viewed and/or downloaded for free via the internet. sealed envelope plainly marked on the outside "RICHLAND COUNTY -- VILLAGE OF SHILOH, WEST MAIN STREET WATER MAIN IMPROVEMENTS BID." and must be delivered to a staff member. The Village of Shiloh office staff shall stamp, time, and date all bids upon receipt if given before the due date The bidder shall be responsible to check for Addenda and obtain same from the web site. The Village of Shiloh office staff shall stamp, time, and date all bids upon receipt if given before the due date. The project has two contracts. Contract A - Water Main & Appurtenances and Contract B - Water Tower Demolition. The bidder may bid on either contract or both (separately). All bids must include a Bid Guaranty, as described in the Instructions to Bidders. Federal DavisBacon Prevailing wage rates apply. No bidder may withdraw its bid within ninety (90) days after the opening; the County reserves the right to waive irregularities, reject any or all bids, and conduct necessary investigations to determine bidder responsibility. This project will be funded by the Water Supply Revolving Loan Account Program as administered by the Ohio Environmental Protection Agency and the Ohio Water Development Authority. The Contractor shall note that there are Disadvantaged Business Enterprise participation goals for this project - 1.3% MBE / 1.0% WBE. This procurement is subject to the EPA policy on encouraging the participation of small business in rural areas (SBRAs). 1. The Project consists of the following contract(s) for the work on the Project: Bid Package # and Description Estimated Construction Cost: Contract A: Water Main and Appurtenances $1,980,000.00 Contract B: Water Tank Demolition $400,000.00 The total estimated construction cost for the Work for the Project for which bids are being solicited at this time is $2,380,000.00.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects