Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 31, 2023

June 17, 2024

September 1, 2024

9 School St

Renovation

No Information to Display

$750,000.00

Public - City

img_map_placeholder

9 School St, N Bennington, VT

Subscribe to View Full Documents

The Village School of North Bennington (VSNB) invites mechanical contractors, general contractors, and construction managers to submit bids for improvements to the North Bennington school building. This is a complete HVAC system installation, the work will include procurement and coordination of qualified subcontractors for various trades in support of the work, including without limitation, electrical work, structural work, cutting and patching, and any and all other work to achieve a complete and acceptable finished project. HVAC work includes: Install rooftop air handler unit, run associated ductwork per drawings, integrate controls with current HVAC control software. STIPULATION: Any work to be done to the roof membrane must be done by Firestone certified contractors Owner reserves the right to reject any and all bids and to waive informalities and irregularities, and to accept any bid that the Owner believes is in its best interest Construction to begin no sooner than June 17, 2024. Construction must be completed prior to September 1, 2024 BONDING: A Bid Bond in the form ofAIAA310 will be required for 5% of the Construction Cost. A Performance and Payment Bond in the form ofAIAA312 will be required for 100% of the Construction Cost. A payment bond on the part of the contractor for 100 percent of the contract price is also required

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects