Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

No Information to Display

803 Douglas St

Renovation

No Information to Display

$25,700.00

Public - City

img_map_placeholder

803 Douglas St, Jackson, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000332533 The work includes the following partial listing of items with approximate quantities: 1. Electrical System Overhaul: a. Install new 100-amp service panel, meter base, riser, and grounding as per MRC 2015. 2. Basement Upgrades: a. Install interconnected smoke and carbon monoxide detector. If hardwiring is not feasible, use a radio frequency interconnect with a 10-year battery. b. Install a dedicated circuit for the furnace. c. Remove all unused wiring. d. Ensure all existing wiring is up to the standard of chapter 38 of MRC 2015. e. Set up four service lights: near the service panel, furnace, and two others evenly spaced. f. Add a GFCI outlet at both the service panel and furnace. 3. Kitchen & Bathroom Enhancements: a. Install dedicated 20-amp circuits with GFCI protection in the kitchen, with receptacles spaced as per chapter 39 of MRC. b. For the bathroom, install a 20-amp circuit with GFCI protection and lighting. 4. General Wiring and Circuitry: a. Replace knob and tube wiring following the 6/12 rule of MRC 2015. b. Install a dedicated circuit for the water heater. 5. Exterior Modifications: a. Set up lights at both the front and rear doors. b. Add tamper-resistant and weather-resistant GFCI receptacles at both entrances.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects