Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

January 1, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Parker, AZ

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

(1) Footprint and Capacity. The Landfill's permitted waste footprint occupies 130 acres of the 160-acre property. As of February 20, 2023, the total unused permitted footprint was 85.9 acres. The Landfill's permitted airspace volume is 25,168,202 cubic yards. The remaining airspace was 19,863,204 cubic yards as of February 20, 2023, and is projected to be 19,661,640 cubic yards as of December 31, 2023. (2) Septage Ponds. The Landfill is permitted to use up to 8.5 acres of Landfill property to operate the surface impoundment of septage. (3) Primary Activities. The primary activities of the Landfill are the transportation and deposition of refuse along with the excavation and stockpiling of cover material and soil. A defined area of the landfill is excavated, lined, and prepared to receive waste before the acceptance of refuse. Cell construction will continue as a cut-and-fill operation, and excavated materials will be used for daily, intermediate, and final cover. Existing site development and ancillary operations may include access roads, an office building/scale house, truck scale, fuel storage tank(s), water storage tank(s), stormwater retention pond(s), temporary hazardous waste storage, utilities, septage ponds, truck shop, maintenance facility, perimeter berms, and security fencing. Final Date for Inquiries: October 19, 2023 Timing. It is able to commence operating the Landfill no later than January 1, 2024.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.