Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

November 17, 2023

June 29, 2024

Multiple Locations

Paving, Renovation, Site Work

No Information to Display

$1,985,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Boston, MA

Subscribe to View Full Documents

M419-C1 - SEAPORT DISTRICT CAMERAS, SOUTH BOSTON, MASSACHUSETTS - Installation of new surveillance cameras at various locations in the Seaport District, South Boston, Massachusetts. Work will involve trenching, installation of ductbank, laying and splicing cable, backfilling, paving, and installation of cameras and IT equipment. It is the intent that the Contract Documents shall prescribe a complete Work or improvement. The Contractor shall remove all obstructions from within the lines of the improvement; and shall do such additional, extra, and incidental Work as may be considered necessary to complete the Work in a substantial and acceptable manner; and when it is so completed, s/he shall leave the Work in a neat and finished condition. The Contractor shall do all the Work and furnish all the materials, equipment, tools, and appliances, except as otherwise specified, necessary or proper for performing and completing the Work required by the Contract, in the manner and within the time specified. S/He shall complete the entire Work to the satisfaction of the Engineer, and in accordance with the Contract Documents. All Work to be done and furnished under the Contract shall be done and furnished strictly pursuant to, and in conformity with the Contract Documents, and also in accordance with the directions of the Engineer as given from time to time during the progress of the Work pursuant to the terms of the Contract. The Notice to Contractors and the Proposal submitted by the Contractor shall also form part of the Contract.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.