Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

January 22, 2024

1033 W Chestnut St

Demolition, Site Work

No Information to Display

$7,200.00

Public - City

img_map_placeholder

1033 W Chestnut St, Junction City, KS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The request for bids is for the demolition of the structure at 1033 W Chestnut St. Bids shall be securely sealed and endorsed upon the outside, Demolition of 1033 W Chestnut St. The City reserves the right to reject any or all bids and to waive any informalities in the bidding. Questions regarding the bids should be directed to Code Enforcement at 785-210-2951. SCOPE The work to be done under this contract includes the furnishing of all labor, materials, equipment, barricades and services necessary for, and incidental to, the proper and safe demolition of all buildings on the site. The Contractor shall also be responsible for the complete removal of all debris to include existing trash, brush, limbs and scrub trees under 6" diameter from the entire lot. Contractor is responsible for obtaining all necessary permits. The Contractor receiving the award for demolition of any structures covered in the contract shall have 60 days after the awards of bids to demolish said structures. If said structures are not demolished in this time this contract will be voided and the demolition will be awarded to the next lowest bidding Contractor. DEMOLITION All buildings on the site will be removed down to the basement floor, if a basement exists, to include all walls. All excavations shall be filled, compacted and graded so lot is level with the adjoining grades and lots. Until actual demolition of structures starts, structures shall remain secured and not accessible to the public. After demolition has started, the Contractor shall have a maximum of seven (7) days to remove said structure.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects