Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

February 29, 2024

Multiple Locations

Renovation

No Information to Display

$795,000.00

Public - City

img_map_placeholder

Multiple Locations, Peabody, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Installation scope of work includes the following Removal of Existing Chiller o Reclaim Refrigerant from existing chiller for proper disposal o Disconnect piping, o Removal of old chiller and discard Upon removal of the existing chiller and with any parts removed as salvage for re-use on the new chiller, it is the intent of these Specifications that the existing chiller, once removed, be taken offsite immediately after removal, for proper legal disposal, all at the Contractor's expense under the Contract price. Installation and Operation of New Chiller: o Crane work to be performed on Saturday at Carroll School , all other locations the crane work is to take place during normal business hours o Install new Chiller o Install new Y-strainer in piping o Make needed piping changes for chiller connections to existing piping o Insulate newly installed piping o Insulation will consist of 2" fiberglass, covered with vinyl jacketing o Electrical connection of new chiller to existing wiring and control panels o Manufacturer recommended Start-up upon installation of new chiller The Bid describes removal and installation of two HVAC chiller units at Carroll Elementary School and Peabody High School. Interested contractors are advised that award of the Contract shall be to a firm with DCAMM Category of work in BOTH Prime Contract trades of HVAC and Mechanical Systems Replace Chiller Units at Two schools Basis of design is replacement of chillers with latest model from manufacturer of the current units.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.