Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 3, 2023
November 4, 2023
April 1, 2024
Baseline Rd
Site Work
No Information to Display
$2,556,000.00
Public - City
Baseline Rd, Boulder, CO
Reference Number 0000332642 The City of Brighton seeks the bid of qualified firms to provide construction services for removal and replacement of a concrete weir structure. The project shall complete later than April 1, 2024, and before irrigation ditches fill. -The City anticipates project work to begin in early November 2023 Question Acceptance Deadline 10/18/2023 at 9:00 AM MT Questions are submitted online No Bonding Requirements - Performance Bond 100 % - Maintenance Bond 100 % - and Materials Bond 100 % - Payment Bond 100 % -- The Bidder shall be required to furnish a Performance and Payment Bond equal to one hundred percent (100%) of the amount of the contract, such Performance Bond to guarantee (a) the faithful performance and completion of the work in strict accordance with the terms of the Contract , A separate and Material Payment Bond in the amount of one hundred percent (100%) of the amount of the contract will be required which will insure the payments of laborers, material suppliers, and sub-bidders in connection with the work performed under the contract and it will satisfy requirements of the Colorado Revised Statutes , A separate Maintenance Bond in the amount of one hundred percent (100%) of the amount of the contract will be required which will insure the repair or replacement where requested by the City, or cost thereof, non-cancelable for a period of two (2) years after the issuance of the certificate of acceptance, of all work performed under the terms of the contract. he City of Brighton owns an existing weir measurement structure along Baseline Road. The existing structure is a 5-foot rectangular sharp-crested weir consisting of a fixed steel plate supported by 12-inch reinforced concrete walls extending into the ditch banks. The existing structure is substandard and requires modification to meet its intended purpose. The City intends to secure a Contractor to remove the existing structure and replace it with a concrete long-throated flume structure. The Work to be performed under this project shall consist of furnishing tools, equipment, materials, and supplies, in addition to furnishing labor, transportation, and performing all work other operations required for the fulfillment of the project t in accordance with the plans and specifications. The Work shall be complete; all work, materials, and services not expressly indicated or called out which may be necessary for the complete and proper construction of the Work in good faith shall be provided at no increase in cost to the City. The Work includes: the furnishing of all labor, materials, and equipment for the supply, delivery, fabrication, installation, testing, and other materials and services required for the Baseline Road Weir Outfall project. Specific features include, but are not limited to: 1. Site preparation. Ditch flows must be bypassed around active construction for the duration of the project. 2. Demolition and removal of the existing structure. 3. Sitework, grading, and foundation preparation. 4. Construction of new long-throated flume structure. 5. Flow recording and telemetry equipment. 6. Site restoration. 7. Surveying and testing
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Boulder, CO
Bid Date: Oct 26 2023
Boulder, CO
Bid Date: Nov 09 2023
Boulder, CO
Bid Date: Nov 06 2023
Boulder, CO
Bid Date: Oct 10 2023
Boulder, CO
Bid Date: Oct 08 2024
Boulder, CO
Bid Date: Oct 24 2023
Boulder, CO
--
Boulder, CO
Bid Date: Aug 18 2023
Boulder, CO
Bid Date: Sep 07 2023
Boulder, CO
Bid Date: Aug 25 2023
Boulder, CO
Bid Date: Aug 09 2023
Boulder, CO
Bid Date: Aug 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
