Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

March 11, 2024

June 30, 2024

Multiple Locations

Site Work

No Information to Display

$214,650.00

Public - County

img_map_placeholder

Multiple Locations, Kissimmee, FL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project includes approximately 19,000 LF of 20-inch reuse main installed via traditional open cut and trenchless technologies as appropriate. Connection locations: o The southern connection point is located west of the intersection of the proposed Southbury Drive and Macy Island Road near the border of Kindred and Tohoqua. o The northern connection point is at NeoCity on the south side of Neptune Road at NeoVation Way. A preliminary design including pipeline routing, initial geotechnical investigation, initial Subsurface Utility Engineering (SUE) investigation, ecological evaluation, and survey are in progress under a separate, previously awarded scope of services. These deliverables are scheduled to be finalized January 2024. Additional SUE, geotechnical engineering, ecological evaluation, and survey may be necessary to complete the final design. The reuse main extension is to be placed into service by October 2025. It is anticipated that final design is too be complete and the construction bids advertised no later than June 2024 to meet this schedule. The selected consultant must coordinate closely with the Kindred and Tohoqua developers and their engineers for design coordination and to avoid conflict with the ongoing private development activities. Questions Due Date Online Portal Deadline to submit Questions Oct 30th 2023, 12:00 PM

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.