Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
January 24, 2024
February 1, 2024
November 5, 2027
9755 Cattaraugus Ave
Renovation
No Information to Display
$36,311,000.00
Public - County
9755 Cattaraugus Ave, Los Angeles, CA
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
New Two-story Classroom Bldg & Site Improvement with Interim Facility & HVAC Replacement. The Project consists of three (3) DSA applications as follows: New 2-Story Classroom Building & Site Improvement, (CLASSROOM) DSA 03-120277; Interim Facility (INTERIM) DSA 03-121896; HVAC Replacement (HVAC) DSA 03- 120387; Contractor will be bidding all projects but will be issued two contracts for the New Classroom and Interim Scope and one for the HVAC. These are to be treated as separate projects with separate Construction Documents, Substantial Completions, and Final Completion. Construction of a new 2-story 9-classroom building and site improvements to include demo of existing utilities, parking lot AC replacement, playground AC replacement and play equipment. Installation of an Ansul Hood system in existing Cafeteria No. 4. Converging the IP in existing buildings 1, 2, 3, 4 and 5. Replacement of the existing clock system in buildings 1, 2, 3, 4 & 5. Demolition of existing modular buildings A, B, C, D, E & F and relocation of existing modular building G & H Installation of a new EMS system and replacement of wall and rooftop HVAC units at existing buildings 1, 2, 3, 4 & 5. At a minimum, there are 7 Rooftop packaged units, 19 outdoor window mounted heat pump units, 9 indoor floor mounted heat pump units, 4 air curtains, 18 exhaust fans and other equipment scheduled. Include shutdown of HVAC units via fire alarm relay modules to existing fire system. HVAC/Substantial Completion (606 calendar days after NTP date): November, 2025 HVAC/Final Completion (676 calendar days after NTP date):January, 2026 District Standard Prequalification Questionnaire Due 10/09/23 The District's Contract Bond Estimate is $36,311,000.00. The District reserves the right to accept or reject the proposed subcontractor.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Dec 06 2023
Los Angeles, CA
Bid Date: Oct 19 2023
Los Angeles, CA
Bid Date: Oct 10 2023
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Oct 12 2023
Los Angeles, CA
Bid Date: Oct 12 2023
Los Angeles, CA
Bid Date: Oct 12 2023
Los Angeles, CA
Bid Date: Oct 12 2023
Los Angeles, CA
Bid Date: Oct 24 2023
Los Angeles, CA
Bid Date: Oct 18 2023
Los Angeles, CA
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
