Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 24, 2024

February 1, 2024

November 5, 2027

9755 Cattaraugus Ave

Renovation

No Information to Display

$36,311,000.00

Public - County

img_map_placeholder

9755 Cattaraugus Ave, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

New Two-story Classroom Bldg & Site Improvement with Interim Facility & HVAC Replacement. The Project consists of three (3) DSA applications as follows: New 2-Story Classroom Building & Site Improvement, (CLASSROOM) DSA 03-120277; Interim Facility (INTERIM) DSA 03-121896; HVAC Replacement (HVAC) DSA 03- 120387; Contractor will be bidding all projects but will be issued two contracts for the New Classroom and Interim Scope and one for the HVAC. These are to be treated as separate projects with separate Construction Documents, Substantial Completions, and Final Completion. Construction of a new 2-story 9-classroom building and site improvements to include demo of existing utilities, parking lot AC replacement, playground AC replacement and play equipment. Installation of an Ansul Hood system in existing Cafeteria No. 4. Converging the IP in existing buildings 1, 2, 3, 4 and 5. Replacement of the existing clock system in buildings 1, 2, 3, 4 & 5. Demolition of existing modular buildings A, B, C, D, E & F and relocation of existing modular building G & H Installation of a new EMS system and replacement of wall and rooftop HVAC units at existing buildings 1, 2, 3, 4 & 5. At a minimum, there are 7 Rooftop packaged units, 19 outdoor window mounted heat pump units, 9 indoor floor mounted heat pump units, 4 air curtains, 18 exhaust fans and other equipment scheduled. Include shutdown of HVAC units via fire alarm relay modules to existing fire system. HVAC/Substantial Completion (606 calendar days after NTP date): November, 2025 HVAC/Final Completion (676 calendar days after NTP date):January, 2026 District Standard Prequalification Questionnaire Due 10/09/23 The District's Contract Bond Estimate is $36,311,000.00. The District reserves the right to accept or reject the proposed subcontractor.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.