Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

January 8, 2025

December 31, 2025

Multiple Locations

Renovation

No Information to Display

$10,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Columbus, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

This project will consist of upgrades or replacements to various HVAC equipment at multiple facilities across the district. The work will largely be focused on at least 10-12 facilities (potentially). It may also include selected air handler, boiler, chiller, automation, or other major component replacements where systems are at or beyond anticipated useful life. The work should also focus on simplification of systems where the planned upgrades will allow (i.e. eliminating hydronic systems where possible, eliminating pneumatic controls, etc.). The project development and construction services are generally described below. The parties will engage in an "open book" pricing method in which subcontracted work shall be based upon competitive pricing that will be reviewed by the Owner (CCS), and Criteria A/E. Owner shall have access to all books, records, documents and other data in the contractor's possession related to itself, its Subcontractors and material suppliers pertaining to bidding, pricing or performance of the Contract. As required by the Agreement, and as properly authorized, provide the following categories of services 1. Experience working in K-12 schools. Repair/replace existing HVAC equipment, utilizing the current HVAC infrastructure, complete with new DDC controls. 2. Mechanical systems: Heating, ventilating and air conditioning ("HVAC") systems, control systems, domestic hot water systems, and distribution systems, etc. 3. Electrical systems: New Electrical Service, Distribution systems, Pre-construction Utility Coordination with AEP and Contribution in Aid in Construction contracts including any easement exhibits. 4. Fire Alarm: Code review, design compliance, testing and approval with Manufacturer's Representative and Authority Having Jurisdiction. 5. Specialty systems: environmental issues if encountered. 6. Modification of Existing systems: As example only, relocation and/or modification of existing lighting systems, repair and/or replacement of existing cabinetry and interior finishes to accommodate new work, and other similar items. 7. Building Automation: Experience planning, designing and implementing solutions that deliver occupant comfort while optimizing system efficiency. LEDE Participation Goal: 20% LEDE subcontracting of the total contract award Anticipated Schedule: Contract Executed: 1/7/25 & Notice to Proceed Issued: 1/8/25 Final Completion 12/31/2025 CCS reserves the right to reject all proposals and cancel at any time for any reason this solicitation, any portion of this solicitation or any phase of the Project. CCS shall have no liability to any Proposer arising out of such cancellation or rejection. CCS reserves the right to waive minor variations in the selection process. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Budget: $8-$10M

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.