Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

January 2, 2024

March 11, 2024

AL-184

Paving, Site Work

No Information to Display

$2,321,941.00

Public - State/Provincial

img_map_placeholder

AL-184, Muscle Shoals, AL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Colbert County Contract Time: 45 Working Days For constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-184 from the junction of SR-2/SR-17/SR-20 (US-43/US-72/Woodward Avenue) in Muscle Shoals to 0.160 mile east of the junction of CR-61. Length 4.708 mi. The Bracket Estimate on this project is from $1,899,770 to $2,321,941 If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 017 - Constructing the Micro-Milling, Resurfacing, and Traffic Stripe on SR-184 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.