Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 17, 2024

June 28, 2024

65 Pleasant St

Renovation

No Information to Display

$850,000.00

Public - County

img_map_placeholder

65 Pleasant St, Upton, MA

Subscribe to View Full Documents

Questions concerning the e-Procurement system may be directed to Derek Dauphinee, Property & Asset Project Manager via email ddauphinee@valleytech.k12.ma.us or by phone 508-529-7758 x3501. The project consists of, but is not limited to, the demolition and furnishing of the existing dust collector system and associated parts, furnishing and installation of a new dust collector system and associated parts, furnishing and installation of a new rooftop gas fired make-up air unit, commissioning of the new dust collector system, in addition to all other work noted in the specifications and drawings. Filed sub-bids will consist of fire suppression, plumbing, and electrical work. Project consists of but is not limited to: Demolition of existing dust collector system and associated parts. Furnish and installation of new dust collector system and associated parts. Furnish and installation of new rooftop gas fired make-up air unit. Fire suppression work. Electrical work. Commissioning of new Dust Collector system. All other work noted in specifications and drawings. The project consists of, but is not limited to, the demolition and furnishing of the existing dust collector system and associated parts, furnishing and installation of a new dust collector system and associated parts, furnishing and installation of a new rooftop gas fired make-up air unit, commissioning of the new dust collector system, in addition to all other work noted in the specifications and drawings. Filed sub-bids will consist of fire suppression, plumbing, and electrical work. Questions concerning the e-procurement system may be directed to derek dauphinee, property & asset project manager via email ddauphinee@valleytech.K12.Ma.Us or by phone 508-529-7758 x3501. If, at the time of the scheduled bid opening, bvt is closed due to uncontrolled events such as fire, snow, ice, wind, or building evacuation, the bid opening will be postponed to the same time on the next normal business day. Proposals must include all documents required by the invitation for bid. The blackstone valley vocational regional district school committee reserves the right to accept or reject any and all bids, in part or in whole, at their sole discretion. The decision of the school committee shall be final and binding on all bidders without recourse. Question Deadline 11/01/2023 at 2:00 PM ET

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.