Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 13, 2023

March 25, 2024

February 28, 2025

463 S Hollenbeck Ave

Remodeling

No Information to Display

$740,000.00

Public - City

img_map_placeholder

463 S Hollenbeck Ave, Covina, CA

Subscribe to View Full Documents

This Project shall be partially or fully funded by federal funds. The District shall conduct all procurement transactions in a manner that provides maximum open and free competition consistent with Title 2, Code of Federal Regulations (2 CFR), Part 200.319(a). The District must share with every proposer all information necessary for submitting a competitive bid. The release of this RFP, evaluation of proposers, and award of a contract will use competitive procurement standards established in all applicable California state and federal statutes and regulations. The District reserves the right to reject any or all proposals, to accept or reject any one or more items of a proposal, or to waive any irregularities or informalities in the proposals. Question Deadline 10/25/2023 at 4:30 PM PT Questions regarding this RFP must be directed to both Robin Harbert and Melinda Pure at the Email: rharbert@c-vusd.org and melinda@ehanda.com Description of Project: All construction and related services, labor and materials required for the demolition of existing pool and associated buildings with remodel of an existing building for equipment, construction of a new building, new pool and deck on the existing campus at Covina High School, 463 S. Hollenbeck Ave., Covina, California, 91723 as per the detailed description below. Covina High School Pool Replacement Project Summary Scope of Work The Covina High School Pool Project replaces the existing pool and associated pool equipment. The new concrete pool (Rim Flow style gutter) is 35 meters long (115'-0") by 25 Yd (75'-1") feet wide. Other structures/components included in this project are as follows: 1. Aluminum bleacher seating for 400 spectators with integral shade structure. 2. A new aquatic building housing restrooms, storage room, outdoor showers, concession space, and office. The building will be constructed using concrete masonry units, metal studs for furring and interior framing, structural steel roof framing, metal roof deck, and single ply roofing. Outdoor showers will be part of the new building and will be constructed of concrete masonry units, structural steel, and porcelain ceramic tile. 3. A renovated pool equipment building housing pool filtration, heating, and sanitizing equipment. 4. 6-inch-thick reinforced concrete pool deck. 5. 6 pole mounted LED pool lighting. 6. 6-foot-high galvanized ornamental iron fencing and gates. 7. Miscellaneous concrete and asphalt paving flatwork/site work. 8. All associated pool timing system and freestanding scoreboard structure. 9. Subgrade reinforced concrete surge chamber. 10. Rerouting and upgrade of affected low voltage cabling currently mounted on existing walkway shelters 11. All associated subgrade utilities and patching of existing ornamental plaza paving. 12. All associated selective demolition. 13. Earthwork. Project DSA Status: The project was approved by DSA, A# 03-122700

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.