Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

No Information to Display

No Information to Display

Macewen Rd

Paving, Site Work

No Information to Display

$5,500,000.00

Public - City

img_map_placeholder

Macewen Rd, Summerside, PE

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

SUMMERSIDE, P.E.I. — A project the City of Summerside has been discussing for a long time will soon be under construction. At the Oct. 3 council meeting, Gordon MacFarlane, the city’s deputy CAO, announced that tenders would go out in early October for the East-West Housing Corridor – formerly called the east-west connector. Once a tender is awarded, the plan would be to begin construction this fall, starting on Water Street and heading North. The plan would be to connect the eastern portion of downtown Summerside with the uptown shopping district, aiming to reduce traffic. The need for a connector had been discussed as far back as 1998 but had never come together. Currently, about 5,000 to 7,000 cars enter the city through Water Street and later turn on MacEwen Road, toward the businesses at the north end of Granville Street – cars which may use a completed corridor. The city has budgeted $5.5 million toward phase one of the project this year. “The traffic trends didn’t increase, necessarily, as quickly as predicted,” said MacFarlane. “But recently, there’s obviously been more traffic, but there’s also been much more of a need for housing.” In addition to helping curb Water Street congestion, the corridor would open up about 345 acres of land, allowing for about 2,000 new units of housing development. “Over the last couple of years, it’s evolved into something that will help us address the housing problem, too,” said Coun. Justin Doiron. “It’s sort of a win-win.” In his opinion, a project like this is needed in the city, and he’s glad to see it finally happening. “It’s fantastic to be a part of it, something that’s been in the works for so long,” he said. “It’s exciting to see physical changes about to happen.”

No Data

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects