Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 11, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

Multiple Locations, Akron, OH

Subscribe to View Full Documents

Elevator Modernization The University of Akron has authorized the Department of Capital Planning and Facilities Management to request qualifications for Professional Design Services for the modernization of three elevators within three buildings on the Akron campus. The University of Akron has authorized the Department of Capital Planning and Facilities Management to request qualifications for Professional Design Services for the modernization of three elevators within three buildings on the Akron campus: Leigh Hall, the existing elevator was installed in 1964, with 5 landings and a 44 foot rise, the Buckingham buiding, installed in 1979, with 4 landings and a 30 foot rise, and the Physical Facilities Operation Center, installed in 1940, with 3 landings, and a 24 foot rise. Full elevator modernization shall include all changes required under current fire, electrical, elevator, and other applicable codes. Work will include the modernization of controller, drive machines, travel and leveling devices, governor, car and counterweight buffers, door operators, door locks, interlocks, and rails, door restrictors, door rollers and gibbs, door spirators and or closers, hoist way access at all landings, full cab modernization, hall call stations, directional signals, and position indicators, and other issues as required. EDGE PARTICIPATION: 5% The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.