Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 18, 2023
November 13, 2023
February 21, 2024
1465 N Batavia St
Demolition, Site Work
No Information to Display
$100,700.00
Public - County
1465 N Batavia St, Orange, CA
***As of October 25, 2023. Project has not been awarded yet. A timeline for award has not been established yet. The Project consists of tree removal, weed overgrowth removal, shipping container removal, signage demolition, graffiti removal, docking bay drainage improvements, fence repairs and installation, and general site clearing for Rancho Santiago Community College District, in compliance with the Contract Documents and Code requirements. The furnishing of all labor, materials, equipment, services, and incidentals necessary for Work of BR SAC Drinking Fountain Repairs and Replacement, 1530 W. 17th Street, Santa Ana, California 92869. The District reserves the right to place and install equipment in areas of the Project prior to Substantial Completion provided that it doesnt interfere with the completion of the Work. This partial occupancy shall not constitute acceptance of the Work by the District Representative. Contract Time. The Contract Time is 65 calendar days from date of Notice to Proceed to Final Completion. Failure to achieve the Contract Time will result in the assessment of Liquidated Damages as set forth in the Contract. The Bid and Contract Documents may be available from sources other than the Purchasing Webpage, including . The District is not responsible for the accuracy or completeness of Bid or Contract Documents obtained from any source other than the Purchasing Webpage. Bidders are solely responsible for the risk of inaccurate or incomplete Bid or Contract Documents obtained from any source other than the Purchasing Webpage. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount equal to Ten Percent (10%) of the maximum amount of the Bid Proposal, inclusive of any additive Alternate Bid Item(s). Failure of any Bid Proposal to be accompanied by Bid Security in the form and in the amount required shall render such Bid Proposal to be non-responsive and rejected by the District. Labor & Materials Payment Bond; Performance Bond. Prior to commencement of the Work, the Bidder awarded the Contract shall deliver to the District two 2 each of Labor & Material Payment Bond and a Performance Bond issued by a California Admitted Surety in the form and content included in the Contract Documents each of which shall be in a penal sum equal to One Hundred Percent (100%) of the Contract Price. No Withdrawal of Bid Proposals. Bid Proposals shall not be withdrawn by any Bidder for a period of 90 calendar days after the opening of Bid Proposals. During this time, all Bidders shall guarantee prices quoted in their respective Bid Proposals. Disabled Veteran Business Enterprises (DVBE) Participation Goal. Pursuant to Military & Veterans Code 999.2 and the Districts Board Policy, the District has established a Good Faith Participation Goal for DVBEs of Three Percent (3%) of the value of the Work. Pre-Bid Questions. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the District in writing by email to facilitiesbid@rsccd.edu (PreBid Questions) by utilizing the Districts Pre-Bid Clarification Form provided within. PreBid Questions and requests for clarifications must be submitted to the District by 5:00 P.M. October 22, 2023.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Orange, CA
Bid Date: Oct 23 2023
Orange, CA
Bid Date: Sep 07 2023
Orange, CA
Bid Date: Oct 30 2023
Orange, CA
Bid Date: Nov 08 2023
Orange, CA
Bid Date: Mar 17 2022
Orange, CA
Bid Date: Oct 19 2023
Orange, CA
Bid Date: Nov 09 2023
Orange, CA
Bid Date: Oct 31 2023
Orange, CA
Bid Date: Oct 31 2023
Orange, CA
--
Orange, CA
--
Orange, CA
Bid Date: Oct 12 2023
Orange, CA
Bid Date: Nov 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
