Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 24, 2023

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Baltimore, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

All questions should be addressed in writing to the Procurement Officer. Please put the RFQ # and Title in the subject line of your email. Questions should be submitted by Monday, October 20th , 2023, by 4:00pm. The contractor shall agree to furnish all labor, material, equipment, and services necessary to perform the scope of work set forth in these specifications. Snow removal will take place on weekends and holidays, if necessary, with regular pay, All lots, sidewalks and steps shall be cleared side to side no later than 6:30 am for snowfalls that occur the previous evening . De-icing operations shall commence upon weather reports or notification by the department representative, Louis Small 410-554-9464 or his designee that at least 1/8th inch of ice is expected or has settled on the sidewalks , Removal of snow will commence when the snowfall has stopped or when 1" of snow has accumulated on lots, driveways, sidewalks, and entrances; whichever comes first. Immediately after snow removal operations, the contractor shall apply a de-icing material on all walkways and lots. Snow shall be removed from all entrance doors. The Department reserves the right to reduce or withhold Contract payment in the event the Contractor does not provide the Department with all required deliverables within the time frame specified in the Contract or otherwise breaches the terms and conditions of the Contract until such time as the Contractor brings itself into full compliance with the Contract.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects