Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 1, 2024

March 23, 2024

Multiple Locations

Site Work

No Information to Display

$800,000.00

Public - County

img_map_placeholder

Multiple Locations, Galveston, TX

Subscribe to View Full Documents

Construction of Rough Cut Detention to Serve Legacy Phase 1, for Galveston County Municipal Utility District No. 82, Galveston County, Texas. Contractor shall commence and complete the Work generally described as follows: Construction of Rough Cut Detention to Serve Legacy Phase 1 for Galveston County M. U. D. No. 82, Galveston County, Texas, according to those particular Plans and Technical Specifications prepared by DE Corp. ("Engineer") and all Extra Work in connection therewith, under the terms as stated in the Contract, and, at Contractor's own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents, including, the Invitation to Bidders, Instructions to Bidders, Contractor's Bid, Contract, Plans, and other drawings and printed or written explanatory matter thereof, and the Technical Specifications, on file with Engineer. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all other Contract Documents, which are made a part of the Contract, and is thoroughly familiar therewith. B. Under this Contract and the Contract Documents, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in the Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be reasonably implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and Contractor shall deliver the installation to Owner in operating condition. C. The Work, in general, under the Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. D. Major items of construction and services required are designated as follows: i. Install and adjust waterlines, valves, valve boxes, flushing valves, fittings, and appurtenances ii. Construct and adjust sanitary sewer, manholes, and appurtenances iii. Repair existing pavement affected iv. Furnish and install all subsidiary items as necessary to complete the project v. Perform testing as specified on installed lines vi. Clean-up project area upon completion

56 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects