Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 1, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

Multiple Locations, Davis, CA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Part of long term water planning is the need to ascertain if Davis has the appropriate soils to provide a medium to support aquifer storage and recovery. Aquifer Storage and Recovery (ASR) consists of pumping treated surface water into an aquifer and then pumping it back into the system when demand exceeds existing summer surface water supply. This study will assess the viability for Davis to use this method for long term water supply and may include testing of existing intermediate wells. There is a placeholder of $1M for future construction, but for FY 23/24 and 24/25, there will be further work on the study and engineering design Project is included in the City of Davis' FY 2023-2028 Capital Improvement Plan (CIP). As of October 13, 2023, information regarding a design team or a general contractor is not available. Funding is anticipated from 2023 to 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.