Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 8, 2024

May 7, 2024

FL-10

Paving, Site Work

No Information to Display

$3,032,489.00

Public - State/Provincial

img_map_placeholder

FL-10, Bonifay, FL

Subscribe to View Full Documents

The Improvements Under This District Contract Consist of Milling and Resurfacing Sr 10 (Us 90) From East of Holmes Creek Bridge To Sr 277 in Washington County Under Fpid 445755-1-52-01. Other Improvements Under This Project Include Minor Drainage Improvements, Signing and Pavement Marking, Replacement of Traffic Monitoring Sensors and Loops, and Expansion Joint Replacement at the End Bents of Existing Bridge No. 610002. Pre-qualification is Required to Bid on This Project Counties: Washington Road Name: SR 10 (Us90) From Holmes Creek Bridge to SR 277 - Resurfacing Limits: 61010000 Project(s): 44575515201(*) Federal Aid No: N/A Total Roadway Length: 2.661 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 2.661 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 Day Standard Contract Days: 120 For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 004 - Resurfacing - SR 10 Question Deadline 11/02/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.