Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

November 20, 2023

February 17, 2026

US-231

Site Work

No Information to Display

$514,366.00

Public - State/Provincial

img_map_placeholder

US-231, Cottondale, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Improvements Under This District Contract Consists of Providing the Labor, Material, and Equipment Necessary to Complete the Landscaping Project Located at Sr 75 (Us 231) From S of Dilmore Rd to S of I-10 Wb Off Ramp Landscaping in Jackson County. Details of This Project Are Shown in the Contract Plans. A Total of 90 Contract Days Will Be Allowed for the Installation Period and 730 Contract Days Will Be Allowed for the Establishment Period. This is a Lump Sum Contract With Only One Pay Item Listed in the Contract. All References to Payment Under Individual Pay Item Numbers, Regardless of Where Those References Are Contained in the Contract Documents or When in Time Any Such Pay Item Reference is Incorporated in the Contract Documents, Are Superseded by the Pay Item References in This Special Provision. Payment for All Work in This Contract Will Be Made Under: Item No. 999-2 Lump Sum Contract - Ls. Pay Adjustments as Shown in the Contract Documents, Regardless of Where Those Pay Adjustments Are Referenced, Shall Not Apply, Except as Provided for in 9-2 Scope of Payments. Counties: Jackson Road Name: Landscaping Limits: 53030000 Project(s): 45105215201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Day Flexible Contract Days: 820 Contractor Experience in Landscaping (Form 850 070 09) is Required to Bid on This Project All Sublet work must be contracted to a small business or businesses as defined by the Department. The subcontractor must also submit a notarized Small Business Affidavit Form provided by the Department prior to the start of work. Bidders must submit the BDI Reference Sheet Form No. 275-000-02 with the bid unless bidder is prequalified in the projects major work type, per Rule 14-22, Florida Administrative Code. Upload the completed BDI Reference Sheet Form No. 275-000-02 as a zip file using the File Attachment Upload folder in the AASHTOWARE Project Bids application. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 003 - Landscaping - SR 75 Question Deadline 11/02/2023 at 5:00 PM CT If You Have Any Technical Questions, You Must Go Through Our Bid Question & Answer Site. Question Posted to This Site on the Seventh Calender Days Prior to the Bid Opening Will Be Responded to by the Department. Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on Electronically.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.