Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

February 12, 2024

November 14, 2024

1005 Aldine Bender Rd

Renovation

No Information to Display

$800,000.00

Public - County

img_map_placeholder

1005 Aldine Bender Rd, Houston, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Queries must be received no later than 5:00 p.m. on Thursday, October 19, 2023 The project shall consist of the following Public Safety Facilities: 1. Fire Station Renovation: Proposed renovated facility as described by the Construction Documents, provided for reference as an attachment to this RFP. 2. Construction Schedule: Reference attached project schedule. A. The Construction Manager-At-Risk shall be accountable for the construction budget and shall work with the architect to identify the design, systems and finishes required to meet the established budget. 1. The Districts reserve the right to modify the construction budgets at any time. 2. Current estimated construction budget is $800,000. B. Performance and Payment Bonds for 100% of the construction cost will be required upon submission of the Guaranteed Maximum Price (GMP). C. The project shall comply with Harris County Prevailing Wage Rates as published for the same quarter of the year as the GMP is issued. D. The Construction Manager-At-Risk shall provide incremental cost evaluation of the project. The project costs shall be identified at the following milestones: 1. 75% Issue CMaR Documents 2. 100% Issue CMaR Documents

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.