Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

January 1, 2024

September 27, 2024

2035 Niagara Falls Blvd

Site Work

No Information to Display

$4,000,000.00

Public - State/Provincial

img_map_placeholder

2035 Niagara Falls Blvd, Niagara Falls, NY

Subscribe to View Full Documents

CR Number: 2102469 The Niagara Frontier Transportation Authority ("NFTA") will receive bids on a general contract for the NFIA - Airfield Guidance Sign and Navigational Aid Rehabilitation, Project Number 12NA1903.The Work of this project provides for the removal and replacement of all existing airfield illuminated guidance signs and modifications to facilitate runway closure work for Runway 10R-28L. The NFTA reserves the right to waive irregularities, to reject any or all bids and to extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 , or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA's Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 25% of the Work with its own forces. The project consists of one general contract with a single Notice to Proceed schedule. The time of completion for the project is 270 calendar days after receipt of the Notice to Proceed. Liquidated damages will be assessed against the Contractor for its failure to complete the project within the time specified. Service-Disabled Veteran-Owned Set Aside: No Disadvantaged Owned Sub-Contracting Goal: 17% Contract term: 270

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.