Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 1, 2023

December 1, 2023

June 1, 2024

7301 N Lcr 1

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

7301 N Lcr 1, Windsor, CO

Subscribe to View Full Documents

Reference Number 0000332513 The Work of this Contract consists of the grading, excavation and placement of concrete, steel fishing pier, hand launch ramp, parking improvements and landscaping. All below high-water mark work shall be completed between March 1st and May 15th, 2024. All remaining work associated with this project shall be completed by June 1, 2024. Liquidated damages will commence on June 2, 2023, unless an extension is granted. Question Acceptance Deadline 10/27/2023 at 5:00 PM MT Questions are submitted online Yes -- All questions about the meaning or intent of the Contract Documents are to be submitted in writing to the Town. Each Bidder shall file with his Bid a an acceptable Bid security in the form of a bidder's bond in an amount not less than five percent (5%) of the total Bid in accordance with the Instructions to Bidders. The Bidder to whom a Contract is awarded will be required to furnish a Performance Bond guaranteeing faithful performance and a and Material Payment Bond guaranteeing payment of all debts arising out of the Work. *Owner reserves the right to reject any or all Bids, to waive any informalities or irregularities therein, and to reject nonconforming, non-responsive, or conditional bids. The decision of the Owner shall be final The Contractor is required to complete the Contract with sustained work efforts once he begins the project. The Contractor will coordinate work activities with the Engineer to minimize impacts to the project area and potential safety hazards to personnel and materials. Work may be temporarily suspended for cold or inclement weather that would impact the quality of the final work. No additional payment will be made for remobilization if the project is suspended.

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.