November 3, 2023
January 2, 2024
September 27, 2024
504 Cedar St
Renovation
No Information to Display
$5,830,785.00
Public - State/Provincial
504 Cedar St, Saint Paul, MN
Andersen Building Upgrades Site Directions: 504 Cedar St. St. Paul, MN 55101 Est. Value: $ 5,830,785.00 Est. Completion Date: Sept. 27, 2024 State Project Number 02AS0034 Andersen Building Upgrades A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Upgrade all existing light fixtures in the facility to LEDs, unless specifically noted otherwise. Upgrade work will include replacement of existing fluorescent fixtures with new LED fixtures, retrofitting existing fluorescent fixtures with new LED retrofit kits, or replacing existing fluorescent lamps with new LED Lamps. Refer to Drawings for additional requirements. 2. Upgrade existing controls to new Crestron Integrated Lighting control system. Provide new Crestron lighting control system, including but not limited to relay panels, switching panels, modules, sensors, power packs, wall switches, cabling, conduits, etc. as required. All system components shall be Crestron. New lighting control system shall be integrated into existing Honeywell EBI system at Capitol Complex.. 3. Remove existing lighting control system, including relay panels in electrical rooms, devices such as vacancy sensors, occupancy sensors, daylight sensors, wall sensors, wall switches, override switches, wiring, cabling, etc. from the facility. No existing lighting control component may be abandoned in place unless explicitly noted by Engineer/Architect. 4. General construction work such as gypsum board construction and repairs, acoustical ceiling panels and interior painting. 5. For all electrical construction work to be completed as part of this project, the ratio between a certified Electrician and an Electrician Apprentice shall be 1:1. The Prime Contractor and/or Subcontractor shall be fully responsible for ensuring that all Electrician and Apprentices working on this construction project will meet this requirement. The Prime Contractor and/or the Subcontractor shall be responsible for providing documentation to the Owner for review upon request, verbally or written. Plans and Specifications were prepared by Edi-Dolejs consulting Engineers, 1112 North 5th Street, Minneapolis, MN 55411. Contact: Pheng Chang. Phone: 612-343-5965. Email: pchang@edi-dolejs.com. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor, overseeing multiple trades or as a Prime Contractor performing electrical and carpentry, the work for at least 3 contracts which have achieved Substantial Completion since September 22, 2018 for construction of General Construction including carpentry, painting, and lighting upgrades and/or retrofits of existing lighting systems and controls. Each of these contracts MUST have had a construction value of $2,500,000.00 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least 5 years of experience with General Construction including carpentry, painting, and lighting upgrades and/or retrofits of existing lighting systems and controls, or similar in scope and value to this project. Each of these contracts must have had a construction value of $2,500,000.00 or greater. This Project has a 3% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. All questions should be submitted no later than October 26, 2023 @ 2:00 PM. The State is not obligated to answer questions submitted after the question due date and time. Soliciting Agent: State of Minnesota, Department of Administration, Craig Fernholz, craig.fernholz@state.mn.us.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Saint Paul, MN
Bid Date: Oct 17 2023
Saint Paul, MN
Bid Date: Oct 19 2023
Saint Paul, MN
Bid Date: Oct 17 2023
Saint Paul, MN
Bid Date: Nov 14 2023
Saint Paul, MN
Bid Date: Oct 17 2023
Saint Paul, MN
Bid Date: Oct 17 2023
Saint Paul, MN
Bid Date: Oct 31 2023
Saint Paul, MN
Bid Date: Mar 13 2023
Saint Paul, MN
Bid Date: Oct 27 2023
Saint Paul, MN
Bid Date: Oct 27 2023
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Aug 16 2023
Saint Paul, MN
Bid Date: Sep 14 2023
Saint Paul, MN
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.