Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 13, 2023

February 12, 2024

July 7, 2024

5325 Broder Blvd

Site Work

No Information to Display

$6,800,000.00

Public - County

img_map_placeholder

5325 Broder Blvd, Dublin, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Last Day for Receipt of Questions 14 calendar days before date for Receipt of Bids. The Project includes the construction of three (3) large recreation areas, seven (7) small recreation areas, and the conversion of two quasi yards into four (4) smaller quasi yards. The scope includes, but is not limited to: o anti-climb fencing on posts o chain-link fence ceiling o detention grade plumbing fixtures o concrete masonry unit walls o concrete floor slabs & striping o detention grade site furnishings, tables, chairs and equipment o sports equipment o security camera & related work All installations must comply with Title 24 of the California Code of Regulations (the California Building Standards Code) and the California Board of State and Community Corrections (BSCC) standards. Construction requirements will include management of an approved quality control program as well as approvals by the Alameda County Sheriff's Office (ACSO), the BSCC, other authorities having jurisdiction (AHJs), and the County's Construction Manager. The County reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the County awards the Contract, the security of unsuccessful bidders shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. To participate in Pre-bid Site Visit, Site Clearance Forms for Site Visit attendees must be submitted to the County, following instructions on form 00 73 13A, by October 25, 2023

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.