Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

March 7, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$1,250,000.00

Public - City

img_map_placeholder

Multiple Locations, Atlanta, GA

Subscribe to View Full Documents

The Atlanta Independent School System (hereinafter, "Atlanta Public Schools" or "APS") seeks a Construction Manager to complete construction to install athletic seating and make related improvements at ten (10) high school sites. The successful Construction Manager will be expected to provide all of the services included in the standard APS Construction Management Agreement for improvements at the following locations: List of Schools 1. BEST / C.S. King Academy 1890 Donald Hollowell Pkwy., NW, Atlanta, GA 30314 2. Carver High School 55 McDonough Blvd., SW, Atlanta, GA 30315 3. Douglass High School 225 Hamilton E. Holmes Dr., Atlanta, GA 30318 4. Jackson, M. High School 801 Glenwood Ave., SE, Atlanta, GA 30312 5. Mays High School 3450 Benjamin E. Mays Drive, SW, Atlanta, GA 30331 6. Midtown High School 320 Irwin Street, NE, Atlanta, GA 30312 (Walden) 7. N. Atlanta High School 4111 Northside Pkwy., NW, Atlanta, GA 30327 8. S. Atlanta High School 800 Hutchens Road, SE, Atlanta, GA 30354 9. Therrell High School 3099 Panther Trail, SW, Atlanta, GA 30311 10. Washington High School 45 Whitehouse Drive, SW, Atlanta, GA 30314 The initial contract will be a lump sum contract for the provision of pre-construction services. The lump sum fee for the pre-construction services is set out in the Fee Sheet attached in Bonfire. Additionally, the Construction Management percentage of general conditions and percent fee for the construction phase will also be set with the initial contract. During the pre-construction services stage, the Construction Manager shall submit a Guaranteed Maximum Price (GMP) to APS for the Project in the entirety, and/or for phases or portions of the Project. If a GMP is accepted by APS, the contract shall be amended to add and incorporate the GMP into the contract (each a "GMP Amendment"). APS shall have no obligation to accept any GMP. Proposals submitted after the bid close date will not be accepted. Note: Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason. 10/18/2023 Deadline for written questions, 2 p.m., ET 10/24/2023 Response to questions to be posted 11/10/2023 Administrative Review 11/17/2023 Evaluation 12/04-08/23 Interviews (Tentative) 01/08/2024 Recommendation to the APS Board of Education

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.