Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

December 11, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

$217,500.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Orlando, FL

Subscribe to View Full Documents

The services to be provided consist of, but are not necessarily limited to, design and construction of a Photovoltaic Array at three locations including the Pine Hills Mainline, Forest Lake Mainline and Curry Ford Mainline Toll Plaza buildings on SR 408, SR 429 and SR 417 respectively. The Pine Hills and Curry Ford locations shall be mounted on a floating array and the Forest Lake location shall be a ground mounted system. The Design/Builder shall perform all investigations, coordination, and design to produce final approved construction plans for three fully operational photovoltaic array systems. Scope of work shall include but not be limited to floating structures, the photovoltaic arrays, drainage, mounting and rack structures, electrical distribution system, utility interconnection, necessary permitting, and traffic control. The Design/Builder shall provide signed and sealed construction plans for the photovoltaic array and corresponding components. The Design/Builder shall be responsible for the furnishing and installation of the arrays, mounting structures, inverters, wiring, transformers, and other electrical and structural components needed to ensure a proper connection to the utility meters for a net metering configuration.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.