Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

November 27, 2023

No Information to Display

3200 W Shiawassee Ave

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

3200 W Shiawassee Ave, Fenton, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Fenton Area Public School District, hereafter referred to as Customer is accepting sealed contractor bids for Removal of a Domestic Hot Water Boiler at the High School Fenton High School o Disconnect and remove the existing boiler. o Furnish and install (1) Lochinvar #AWN286PM Domestic Hot Water Boiler. o Furnish and install (1) Neutrasafe Condensate Neutralizer Kit. o Furnish and install (2) Lochinvar #RJA120 ASME Vertical Storage Tanks. o Re-pipe inlet and outlet water to new storage tanks as required. o Replace existing system primary pump as required. o Furnish and Install (1) Lochinvar #LTCPA30 15 gallon ASME Expansion Tank. o Re-connect vent and intake PVC as required. o Re-connect electrical and gas utilities as required. o Fill and vent system. o Check, Test and Start-up. o The district will be responsible for asbestos removal if necessary Installation, Configuration, and Training Services Start up and adjustment of new boiler. Owner training and review of the new equipment. Operation and Maintenance manuals complete with custom wiring diagrams. Every request for such interpretation shall be in email and addressed to Joe Humpert, Director of Operations jhumpert@fentonschools.org

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.