Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2023

December 14, 2023

May 23, 2024

Canyon Rd and Campus Loop

Paving, Site Work

No Information to Display

$394,216.00

Public - City

img_map_placeholder

Canyon Rd and Campus Loop, Livermore, CA

21

14

22

6

Subscribe to View Full Documents

**As of December 8, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Reference Number 0000331837 The Project is located at Collier Canyon Road and Las Positas Community College Campus Loop Road in the City of Livermore. The Project will connect the existing City's Montage Trail adjacent to the Shea Homes Subdivision to Collier Canyon Road and will include intersection improvements. The existing Montage Trail traverses east-west adjacent to Shea Homes and terminates east of Collier Canyon Creek. The of work includes demolition of concrete curb, gutter, sidewalk, ADA ramps and pavement; and construction of new trail segment, asphalt concrete, sidewalk, ADA ramps, utility relocation, crosswalks, and lane striping. The Project will consist of selective demolition of concrete curb and gutter, sidewalk, curb ramps, median, asphalt concrete, storm drain pipe, storm drain catch basin, retaining wall, and traffic striping. The Project will construct new concrete curb and gutter, sidewalk, ADA curb ramps, asphaltic concrete, aggregate base, storm drain pipe, storm drain catch basin, signage, and traffic striping. Work on or adjacent to Campus Loop Road is on Las Positas Community College right of way. The Engineer's estimated construction cost is: $320,000 Job Location Intersection of Collier Canyon Rd and Campus Loop, Livermore, California [37.708995, -121.804969] General Requirements - Certified Payroll - Contractors License Required - Insurance Required - Required Question Acceptance Deadline 10/31/2023 05:30 PM EDT Questions are submitted online No -- Questions regarding the Project, the bid procedures, or the meaning or intent of the Contract Documents must be submitted via email to the Engineer at: Leon Taing, P.E., Associate Civi! Engineer lbtaino@livermoreca.qov Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Surety Bond 15 % - Payment Bond 100 % -- The successful bidder will be required to provide performance and payment bonds each in the amount of 1O0o/o of the Contract Price and a Warranty Bond in the amount of 15o/o of the Contract Price. * City reserves the right to reject any and all bids and to waive any non-substantive irregularities.

55 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.