Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

December 21, 2024

June 21, 2026

4755 Walma Ave SE

New Construction, Site Work

No Information to Display

$171,175.00

Public - City

img_map_placeholder

4755 Walma Ave SE, Kentwood, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000332369 The City is requesting responses to this RFP to procure the services of a qualified construction management firm utilizing the Construction Manager at Risk project method to build the Kentwood Community Center. The firm selected as a result of this RFP will provide both pre-construction and construction phase services, and work collaboratively with the City and its design professional's team through the course of design and construction. The CMAR will assume the risk of delivering the project through a guaranteed maximum price contract as well as responsibility for construction means and methods and will be required to solicit bids from qualified subcontractors in a manner consistent with City procurement standards to perform the construction work. The CMAR may competitively bid to self-perform portions of the Work. Job 4755 Walma Avenue, SE Kentwood, MI 49512 Question Acceptance Deadline 10/23/2023 02:00 PM EDT Questions are submitted online Yes Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Preconstruction phase services by the CMAR may include the following: 1. Work with City and the design team as a collaborative partner in developing solutions for the Project 2. Provide Value Engineering 3. Provide detailed cost estimating and knowledge of marketplace conditions 4. Provide project planning and scheduling 5. Develop construction phasing and scheduling that will minimize interruption to the City Complex/project area 6. Provide alternate systems evaluations and constructability studies 7. Advise City on ways to gain efficiencies in project delivery 8. Provide long-lead procurement studies and initiate procurement of longlead items 9. Assist in the permitting processes 10. Participate with City in a process to set goals for DBE participation and implement a DBE program 11. Protect the City's sensitivity to quality, safety, and environmental factors 12.Advise the City on choosing sustainable building materials and processes 13.Develop and implement an existing utility investigation plan 14.Prepare and provide GMP packages for a phased construction scope of work 15.Document control for all communications, documents, submittals, etc.

84 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.