Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 8, 2023

January 8, 2024

April 2, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Panama City, FL

Subscribe to View Full Documents

The Project includes the following Work: Primary project components include approximately 6200 linear feet of roadway and utility improvements. Utility upgrades include water main distribution system upgrades, gravity sewer collection system replacement, and gravity sewer system rehabilitation. Gravity sewer system rehabilitation shall include lateral repairs, sewer liner/CIPP, lateral repairs, and/or other rehabilitation as noted in the design documents. Roadway improvements include the demolition and reconstruction of the 6200 linear feet of roadway as described in the design documents. The Project has an expected duration of 450 days. Question Deadline 11/01/2023 at 5:00 PM CT Bidder shall submit all questions about the meaning or intent of the Bidding Documents to the City of Panama City's Purchasing Division. PHONE: (850) 872-3070 EMAIL: purchasing@panamacity.gov Approximately 6,200 linear feet of roadway and utility improvements. Utility upgrades include water main distribution system upgrades, gravity sewer collection system replacement, and gravity sewer system rehabilitation. Gravity sewer system rehabilitation shall include lateral repairs, sewer liner/CIPP, lateral repairs, and/or other rehabilitation as noted in the design documents. Roadway improvements include the demolition and reconstruction of the 6,200 linear feet of roadway as described in the design documents.

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.