Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

December 6, 2023

December 6, 2024

Multiple Locations

Site Work

No Information to Display

$2,100,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Circleville, OH

Subscribe to View Full Documents

US23 Water Transmission Line Phase 1 Bids for more information or contact the office at 1-740-474-3114x123. The work covered by the Contract Documents includes, but is not limited to, the following: 1. LOCATION OF THE PROJECT A. The project has three locations: 1. Site #1: Treatment Plant located at 24991 US 23, Circleville, OH 43113. 2. Site #2: Along and outside the northern boundary of the Logan Elm Village Subdivision. 3. Site #3: South side of the Tarlton Road Railroad overpass bridge east of 2300 Owens Rd 2. PROJECT DESCRIPTION A. The project consists of, but not limited to, installing approximately 4000 the EHRWSD Water Treatment Plant to Chickasaw Drive located at the northeast corner of the Logan Elm Village Subdivision. The project will be split into Phases 1A and 1B. B. The project will be offered for bid via a single contract for each phase or a single contract incorporating the combination of both Phases per the following: 1. Phase 1A WTP to US 23 a. Site#1: Approximately 1200 and jack and bore methods (under CSX Railroad) from the existing Water Treatment Pla and Wacker Drive to the east side of US 23, including testing and miscellaneous appurtenances. b. Site#3: Approximately 240LF of 10 water main installed via jack and bore methods (under Norfolk Southern Railroad). c. Alternate #1 2 nd bore and jack under US 23 per the Contract Documents. 2. Phase 1B US 23 to Chickasaw Drive a. Site #2: Approximately 2830 methods from the east end of the new bore and jack under US Route 23 performed in Phase 1A to its connection to the existing waterline located at the northern end of Chickasaw Drive, including transmission line connections to existing waterlines, testing, and miscellaneous appurtenances. Question Deadline 10/30/2023 at 3:00 PM ET

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects