Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
November 9, 2023
January 8, 2024
October 4, 2024
State Rd S-13-682
Paving, Site Work
No Information to Display
$1,000,000.00
Public - County
State Rd S-13-682, Pageland, SC
Const. of +/-1,530LF Phase IIA Ind Park Lane, +/-1,425 LF Phase IIB North Park Lane, +/- 1,525 LF Resurface Existing Phase I Roadways, +/- 139-Acre Lynches River Ind Park along Dove Sutton Road. (S-682) Near the Town of Pageland Chesterfield County, South Carolina Question Deadline 11/01/2023 at 5:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Any questions for clarification will be emailed to swhaley@alliancece.com The Owner reserves the right to waive any informality or to reject any or all bids. Base Bid: This project consists of providing all required materials, equipment, and labor necessary to complete the construction +-1,530-LF Phase IIA Industrial Park Lane; +-1,425-LF Phase IIB North Park Lane; and +-1,525-LF Resurface Existing Phase I Roadways (Industrial Park Lane and East Park Lane) at the +-139-Acre Lynches River Industrial Park Along Dove Sutton Road (S-682) Near the Town of Pageland Chesterfield County, South Carolina. The Roadways and Stormwater Improvements include Clearing, Grubbing to construct approximately 3,000 Linear Feet (LF) of Two (2) Twelve (12)-foot Lanes with Shoulder and Ditch Section, Storm Drainage Systems, Three (3) major culvert crossings, and Two (2) Stormwater Basins, Erosion Control Measures, and Grass Disturbed Areas. Specific Details are included within the Construction Plans and Technical Specifications. Chesterfield County requests when constructing the roadways, that the connection from Dove Sutton Road down to Lot 3 be constructed to sub-grade before completing the remaining portion of the roadways to allow access for construction of Lot 3. Contractors shall have a proper and active South Carolina License Classification.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pageland, SC
Bid Date: Sep 19 2023
Pageland, SC
Bid Date: Oct 17 2023
Clinton, SC
Bid Date: Oct 23 2023
Charleston, SC
--
Aiken, SC
Bid Date: Oct 23 2023
McCormick, SC
Bid Date: Oct 23 2023
Chester, SC
Bid Date: Oct 20 2023
Greenville, SC
Bid Date: Nov 17 2023
Gaston, SC
Bid Date: Sep 12 2023
Columbia, SC
--
Johns Island, SC
Bid Date: Oct 13 2023
West Columbia, SC
Bid Date: Oct 13 2023
Moncks Corner, SC
Bid Date: Oct 13 2023
Charleston, SC
--
Abbeville, SC
Bid Date: Oct 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
