Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
April 1, 2024
December 30, 2024
8 Andrew Ave
Renovation
No Information to Display
$8,000,000.00
Public - City
8 Andrew Ave, Wayland, MA
Roofing and Flashing; Metal Windows; Waterproofing, Damp-roofing and Caulking; Acoustical Tile; Tile; Resilient Floors; Glass & Glazing; Painting; Plumbing; Mechanical; Electrical; Fire Protection . Question Deadline 10/17/2023 at 10:00 AM ET The Contractor shall prevent surface water and subsurface or groundwater from flowing into excavations or earthwork areas which would cause flooding of the Project Site and surrounding area or softening or loosening of the soil at excavation or earthwork sub-grades. B. The Contractor shall provide adequate and satisfactory dewatering and drainage of excavations and furnish all materials and equipment and do all incidental work required in conjunction with the furnishing, installing and maintaining of same to permit construction to proceed in the dry. The Contractor may choose any satisfactory method he wishes for controlling groundwater or surface water encountered in the Work, provided the dewatering required is performed in accordance with all federal, state, and local codes, ordinances, and regulations. The Contractor shall obtain all necessary permits and assume all responsibility for the adequacy of the methods, materials and equipment employed. The Contractor shall bear the full cost of providing the dewatering at all times of the year, throughout the construction period, and no additional payment shall be made for this work. The Contractor shall take all precautions necessary to prevent loosening or softening of the sub-grade. In this regard, the Contractor shall at all times be prepared to alter his construction method or sequence. Dewatering and control of water shall be conducted as necessary to prohibit seepage, groundwater flow or surface infiltration and runoff from, in any way, undermining or otherwise damaging adjacent structures and utilities.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Wayland, MA
Bid Date: Nov 01 2023
Wayland, MA
Bid Date: Nov 14 2023
Wayland, MA
Bid Date: Sep 10 2020
Wayland, MA
Bid Date: Sep 03 2020
Wayland, MA
Bid Date: Aug 24 2023
Plymouth, MA
--
Springfield, MA
Bid Date: Oct 25 2023
Grafton, MA
Bid Date: Oct 20 2021
Springfield, MA
Bid Date: Oct 04 2023
Melrose, MA
Bid Date: Oct 27 2023
Boston, MA
Bid Date: Nov 01 2023
Hanscom AFB, MA
Bid Date: Oct 16 2023
South Easton, MA
--
Lexington, MA
Bid Date: Oct 25 2023
Andover, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
