Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

April 1, 2024

December 30, 2024

8 Andrew Ave

Renovation

No Information to Display

$8,000,000.00

Public - City

img_map_placeholder

8 Andrew Ave, Wayland, MA

Subscribe to View Full Documents

Roofing and Flashing; Metal Windows; Waterproofing, Damp-roofing and Caulking; Acoustical Tile; Tile; Resilient Floors; Glass & Glazing; Painting; Plumbing; Mechanical; Electrical; Fire Protection . Question Deadline 10/17/2023 at 10:00 AM ET The Contractor shall prevent surface water and subsurface or groundwater from flowing into excavations or earthwork areas which would cause flooding of the Project Site and surrounding area or softening or loosening of the soil at excavation or earthwork sub-grades. B. The Contractor shall provide adequate and satisfactory dewatering and drainage of excavations and furnish all materials and equipment and do all incidental work required in conjunction with the furnishing, installing and maintaining of same to permit construction to proceed in the dry. The Contractor may choose any satisfactory method he wishes for controlling groundwater or surface water encountered in the Work, provided the dewatering required is performed in accordance with all federal, state, and local codes, ordinances, and regulations. The Contractor shall obtain all necessary permits and assume all responsibility for the adequacy of the methods, materials and equipment employed. The Contractor shall bear the full cost of providing the dewatering at all times of the year, throughout the construction period, and no additional payment shall be made for this work. The Contractor shall take all precautions necessary to prevent loosening or softening of the sub-grade. In this regard, the Contractor shall at all times be prepared to alter his construction method or sequence. Dewatering and control of water shall be conducted as necessary to prohibit seepage, groundwater flow or surface infiltration and runoff from, in any way, undermining or otherwise damaging adjacent structures and utilities.

41 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.