Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 16, 2023

No Information to Display

1331 W Cherry St

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

1331 W Cherry St, Milwaukee, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Furnish labor, material and service necessary to remove/replace the roof at 1331 West Cherry Street, Milwaukee, WI 53205 Section 3 Plan/Policy/Compliance Forms Package (Complete/sign applicable pages with and return with bid) If you have any Section 3 questions, please contact Konita Jude at 414-286- 2940 or Kpiude@hacm.org ROOF 1. Safeguard property from falling objects coming from the roof. 2. Remove existing shingles, drip edge, and any damaged or rotted roof sheathing and/or deck board on garage. 3. Contractor to replace any rotted roof sheathing, and properly prepare surface for roofing material. Contractor also to address/repair fascia at NW corner behind gutter prior to re-roofing. 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. install new drip edge on eaves. 6. Install engineered roof barrier/membrane. TIGER PAW or equivalent compatible with chosen roofing system. 7. Install starter strips at base of roof and roof eaves 8. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. 9. Install 30-year dimensional shingles TIGER PAW, or approved equivalent. PROJECT MANAGER MUST APPROVE THE COLOR BEFORE INSTALLATION. Contractor shall use a minimum of 4 nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90 degree angle to surface. Installation to follow manufacturers guidelines. Color to match house roof house roof. 10. Provide minimum 30-year manufacturer's warranty on installed roofing system

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.