Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

November 27, 2023

September 1, 2024

230 Main St E

New Construction, Renovation

No Information to Display

$135,000.00

Public - State/Provincial

img_map_placeholder

230 Main St E, Eagle Bend, MN

Subscribe to View Full Documents

Todd-Wadena Community Corrections Site Directions: Todd-Wadena Community Corrections 230 Main Street East Eagle Bend, MN 56446 Est. Completion Date: Sept. 1, 2024 New single story wood framed building for the Todd-Wadena Corrections Department. SCOPE: Mechanical Contractor shall perform all excavation required for his work. 2 EXCAVATION: Contractor shall do all excavation required to install pipe to depth shown on plans. The bottom of all trenches shall be accurately graded to provide uniform bearing and support for each section of the pipe on undisturbed soil at every point along its entire length, except for "bell holes" which shall be dug after the trench bottom has been graded. Excess excavation below the required level shall be backfilled with washed sand and thoroughly tamped. Contractor shall remove by pumping, or other means, any water which has accumulated in the excavation. Contractor shall do all shoring and bracing necessary to perform his work and required by safety. Temporary bridges shall be built by Contractor where required to maintain traffic. Refer to soil boring tests for dewatering. Refer to architectural specifications for other special requirements. Installation of underground plastic pipe shall comply with ASTM D2321.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.