Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

Cathedral Canyon Dr

Demolition, Paving, Remodeling, Renovation, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Cathedral Canyon Dr, Cathedral City, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

SCOPE OF WORK: Cathedral Canyon Drive Sidewalks and Multiuse Trail (C08505) The scope of work consists of furnishing all supervision and labor, materials, necessary equipment, and tools, utility work, traffic control and public services coordination required for the completion of the Project. The work to be done includes mobilization, traffic control, stormwater BMPs, construction staking and perpetuation; grading; clearing and grubbing; removal of utilities, trees, AC pavement, PCC, base, subgrade, native material, and unclassified material; construction of AC pavement over compacted CAB; construction of full depth AC; construction of PCC sidewalk, curb ramp, curb and gutter, cross gutter and spandrel, and retaining curb; construction of slough wall; construction of decomposed granite over compacted native material; adjustment to grade and/or relocation of utilities; construction of cabinet foundation and extension of existing conduit and wiring for relocated utility; coordination for relocation of utilities by others; signing and striping; and furnishing and installation of speed feedback sign and hybrid beacon per project documents. Work shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the currently adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. Date Palm Drive Expansion (C08508) The scope of work consists of furnishing all supervision and labor, materials, necessary equipment, and tools, utility work, traffic control and public services coordination required for the completion of the Project. The work to be done includes mobilization; traffic control; stormwater BMPs; construction survey and perpetuation; grading; clearing and grubbing; demolition, removal, hauling, and disposal of pavement, subgrade, curb and gutter, sidewalk, driveway; landscaping area, unclassified excavation, fencing, concrete footing,, handrailing and utilities; construction of wall; compaction of native material;, construction of AC and PCC pavement; construction of cement-stabilized base; construction of PCC driveway, curb ramps, curb and gutter, and sidewalk; construction of storm drain improvements; relocation or adjustment existing utilities; installation of railing, and signing and striping. Work shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the currently adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.