Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

November 17, 2023

February 17, 2024

BC-37A

Site Work

No Information to Display

$1,000,000.00

Public - Federal

img_map_placeholder

BC-37A, Stewart, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

Two Phase Selection Process: This is the first phase (Phase One) of a two-phase competition. The first phase will evaluate the qualifications of all bidders. The second phase, (Phase Two), will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings which will be accessible through SAP Ariba. Upon award of a contract in Phase Two, the pre-qualification list resulting from the first phase will expire and will not be used in any other solicitation. Following Phase Two solicitation closing, bid results will be recorded and may be obtained by e-mailing a request to the address indicated in the Invitation to Tender. Fisheries and Oceans Canada requires a contractor to assist with replacing and repairing the approach and wharfhead at the Stewart Small Craft Harbour. The following is a general summary of the works included in this project. The work completed under this contract shall include the supply of all equipment, labour and materials necessary for the performance of the work. All waste material shall be disposed of by the Contractor in strict accordance with provincial, local and municipal regulations and Part 8 of the National Building Code and with the Canadian Construction Safety Code. The work to be carried out under this contract generally includes the following mandatory work: 1. Mobilization/Demobilization 2. Removal of Existing Approach 3. Detach and Reinstall Gangway 4. Supply and Installation of Prefabricated Steel Approach 5. Clearing and Grubbing 6. Excavation for New Concrete Post Footings 7. Installation of New Concrete Footings 8. Installation of New Steel Posts 9. Backfilling of Slope 10. Supply and Placement of Geotextile 11. Supply and Placement of New 10kg Riprap 12. Supply and Placement of New 100kg Riprap 13. Detach and Reinstall Utilities The following is a list of optional work items that are located towards the south end of the project site. The Departmental Representative will determine whether or not the optional work is to be completed prior to executing the contract: 1. Supply and Installation of Prefabricated Steel Approach Roof All off-site work may commence immediately upon award. The project site is located at Stewart Small Craft Harbour, BC-37A, Stewart, BC. To assist with bonding and insurance requirements, this project is estimated to cost approximately between $500,001 to $1,000,000. Documents can be obtained from https://discovery.ariba.com/rfx/17628045 The estimated contract period will be 4 month(s),

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.