Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 1, 2024

December 26, 2024

799 E Brockway Ave

New Construction, Paving, Site Work

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

799 E Brockway Ave, Morgantown, WV

Subscribe to View Full Documents

Marilla Park New Pool Complex The Project includes the following Work: A new pool complex will be constructed at a new location within Marilla Park from where the existing pool is located. The new complex will include a leisure pool, lazy river, lap lane pool, three water slides, splash pad, and other related aquatic recreation items such as spray features, crossing activities, and a diving board. The pool complex will also include the development of two new buildings. Building one will include locker rooms, pool mechanical room, and storage space on floor one. Floor two will consist of administrative office space. A picnic shelter is also connected to building one. Building two will include a ticketing office, restrooms, and a splash pad mechanical room. This project will also include the development of a new parking lot area, walkways, shade sails, landscaping, and playground areas. Bids shall be accompanied by a certified check or bid bond payable to Morgantown Board of Parks and Recreation in an amount equal to five percent (5%) of the base bid. Marilla Pool Complex The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 360 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. All Bidders are required to have a West Virginia Contractor's License per Section 30-42-12 of the West Virginia Code. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidding Documents also may be examined at The Thrasher Group, Inc. 600 White Oaks Boulevard Bridgeport, WV 26330 Contractor's Association of WV 2114 Kanawha Boulevard East Charleston, WV 25311. The Morgantown Board of Parks and Recreation reserves the right to reject any and all bids. POOL BUILDING: FIRST LEVEL: 4,987 GROSS SQ.FT. SECOND LEVEL: 1,813 GROSS SQ.FT. ENTRANCE BUILDING: 1,440 GROSS SQ.FT.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects