Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 1, 2023

February 23, 2024

S Elm St & E 4th Ave

Paving, Site Work

No Information to Display

$1,500,000.00

Public - City

img_map_placeholder

S Elm St & E 4th Ave, Kennewick, WA

Subscribe to View Full Documents

The East 4th Avenue and Elm Street Watermain Replacement project consists of the installation of water mains and new fire hydrants within the City of Kennewick right of way, and crossing a Columbia Irrigation District Canal. This project also includes the relocation of existing water meters and service lines along the water main alignment, and relocating existing backyard water meters and service lines out to street fronts. The project is located on South Elm Street, South Gum Street, East 3rd Avenue, East 4th Avenue, East 5th Avenue, and East 6th Avenue, including within private property adjacent to some of these locations. Work includes, but is not necessarily limited to, installation of water mains and related construction, new casing and canal lining at the Columbia Irrigation District canal crossing, new water services, new fire hydrants, replacement of substandard meters and meter boxes, trench pavement restoration, concrete sidewalk and curb replacement, landscaping, and other miscellaneous work as called for on the construction plans and these special provisions. a bid proposal deposit in cash, certified check, cashier s check or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish a satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Kennewick The City will post any Addenda and Bidder questions & answers solely through electronically . The City cannot guarantee receipt of all bidder documentation to outside third-party centers . For questions or additional information, please call 509- 585-4287. The City of Kennewick reserves the right to waive any informalities or to reject any or all bids The Engineer's Estimate is: $1,100,000 to $1,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. P2308 23.0090

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.