Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 24, 2023
November 23, 2023
No Information to Display
11411 S Eggleston Ave
Renovation
No Information to Display
$39,340.00
Public - City
11411 S Eggleston Ave, Chicago, IL
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Questions Due Date: Oct 5th 2023, 3:30 PM CDT For copy of bid documents contact: Tabatha Sinish at 312-813-7050 or Lakisha Smith at 773-703-4876 or Melanie Rush at 773-251-5718. Provide Labor and Materials: Apply Skim Coat, Install VCT (Chocolate colored), strip and re-wax floors (with 3 coats) for approximately 4,122 sq. ft of space between two floors. This job is expected to be completed in two parts in conjunction with abatement work. The first half (approximately 1,500 sq. ft) will be completed during Thanksgiving break and second half will completed during Christmas break. 1) Furnish and install Skim Coat. 2) Furnish and install commercial grade 12x12 VCT (Chocolate colored) 3) Strip and rewax floor with at least three coats of wax applied after install. 4) Dust, Fume & Odor Control Throughout and Construction Waste Disposal. 5) Contractor to secure necessary permits. 6) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 7) Not responsible for contractor errors as a result of non-field verification. 8) Materials and installation must comply with CPS Standards and Specifications as listed on ) SECTION 09 30 00 TILING 9) Secure job site overnight if work is not completed in one day. 10) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 11) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 12) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 13) Contractor is to remove and dispose of materials torn out and any construction debris. 14) All trash must be removed off-site by contractor. 15) Clean the surrounding area and make sure all is swept of debris. 16) All questions/requests must be received two (2) business days prior to bid closing.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Chicago, IL
Bid Date: Oct 24 2023
Chicago, IL
Bid Date: Oct 24 2023
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Oct 27 2023
Chicago, IL
Bid Date: Oct 24 2023
Chicago, IL
--
Chicago, IL
Bid Date: Oct 26 2023
Chicago, IL
--
Chicago, IL
Bid Date: Nov 14 2023
Chicago, IL
Bid Date: Jul 25 2023
Chicago, IL
Bid Date: Oct 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
