Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 30, 2023

November 27, 2023

February 2, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$600,000.00

Public - County

img_map_placeholder

Multiple Locations, Orange, CA

Subscribe to View Full Documents

This project includes but is not limited to installation of Owner Furnished Contractor Installed (OFCI) shade structures and related site improvements such as walkways, utilities, and driveways at Canyon Rim Elementary, Fletcher Academy, West Orange Elementary, and Fairhaven Elementary. Online Q&A Yes Q&A Deadline 10/23/2023 2:00 PM (PDT) QUESTIONS REGARDING THIS NOTICE: Email Bids@OrangeUSD.org or call 714-628-4440. Location Canyon Rim Elementary School 1090 The Highlands, Anaheim Hills, CA 92808 Fletcher Mandarin Language and GATE Academy 515 W Fletcher Ave, Orange, CA 92865 West Orange Elementary School 243 S Bush St, Orange, CA 92868 Fairhaven Elementary School 1415 Fairhaven Ave Santa Ana, CA 92705 The Contractor shall be responsible for cutting, fitting, or patching to complete the Work and to make all parts fit together properly. Contractor shall be responsible for ensuring that all trades are coordinated and scheduled so as to ensure the timely and proper execution of the work. When modifying existing work or installing new Work adjacent to existing work, Contractor shall match, as closely as conditions of Site and materials will allow, the finishes, textures, and colors of the original work, refinishing existing work at no additional cost to District. All cost caused by defective or ill-timed work shall be borne by Contractor. Contractor shall be solely responsible for protecting existing work on adjacent properties and shall obtain all required permits for shoring and excavations near property lines.

32 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.