Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 20, 2023

November 20, 2023

No Information to Display

2540 Maile Wy

Demolition, Paving, Site Work

No Information to Display

$140,000.00

Public - State/Provincial

img_map_placeholder

2540 Maile Wy, Honolulu, HI

Subscribe to View Full Documents

Prevailing rate of wage project consisting of demolishing the existing landscape building 1194 and warehouse and redeveloping the site to provide a new auxiliary parking lot. The existing Transportation Services parking lot will be demolished and redeveloped to provide newly engineered pre-manufactured metal building for vehicle bays, warehouse, equipment storage, and workspace. Additionally, a Greenhouse Nursery will be added. The project development is designed for the operation of the University of Hawai'i maintenance staff. Construction duration of 330 calendar days and pricing to be held throughout the construction phase. HI Lic. No. 30496 CA Lic. No. 632667

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects